Using the Add Data command
Pasos:
- Click the Add Data button on the ArcMap Standard toolbar.
- Navigate to the geodatabase that contains the schematic dataset where the desired schematic diagram is referenced.
- Browse to the schematic dataset or the schematic folder that contains this schematic diagram.
- Choose the schematic diagram.
- Click Add.
The Add Data dialog box opens.
The schematic diagram is added to the active data frame.
Temas relacionados
9/11/2013